|
Ayrshire, Dumfries and Galloway |
|
|
|||||||||
|
|||||||||
|
|
|
3.12 Future Developments The options included in the BPEO evaluation are generic and for the most part, with the exception of Dumfries and Galloway who are at an advanced stage in their private/public partnership project, not site-specific. Hence site-specific development proposals that arise both inside and outside the borders of the Waste Strategy Area are valid and may satisfy or improve the agreed BPEO. Regional or national-scale waste facilities may be proposed by developers at a scale designed to attract waste from outside the WSA in which they are located. As part of the planning application process, the developer will be required to demonstrate that the proposals satisfy or exceed the BPEO of the WSA from which the waste will be obtained as well as for the area receiving the waste. The results of this BPEO evaluation will be a material consideration in the planning process for such developments. Where existing or proposed regional or national-scale facilities will result in waste movement between WSAs, then consideration of the proposed waste exports and imports must be included in the BPEO process, as described in the following sections. The 'Export or Import' of waste should be considered as part of the BPEO process for both the importing and exporting areas, where it is proposed as an original or developing option. Any subsequent review of the BPEOs should also take this into consideration. Approval of the proposed waste-management facilities in the importing area is a matter for consideration by the planning and licensing authorities. |
|
|
|||||||||
|
|||||||||
|
|