North East Area Waste Plan |
|
|||||||||
|
3.11 Future Developments and Proposals The BPEO for MSW in the North East has been chosen with
regard to a given set of assumptions and the methods and technologies
currently available. It is accepted that changes in legislation, technology
or knowledge may mean the chosen BPEO could be superseded. To allow
for future developments or proposals not included in the plan, the BPEO
will be kept under review and may be amended by valid proposals that
can be shown to provide a better BPEO. The Waste Strategy Area Group
will consider evaluating relevant waste-management proposals for an
improved BPEO as they arise. The options included in the BPEO evaluation are generic
and for the most part, not site-specific. Hence site-specific development
proposals that arise both inside and outside the borders of the Waste
Strategy Area are valid and may satisfy or improve the agreed BPEO. Regional or national-scale waste facilities may be proposed
by developers at a scale designed to attract waste from outside the
Waste Strategy Area in which they are located. As part of the planning
application process, the developer may be required to demonstrate that
the proposals satisfy or exceed the BPEO of the Waste Strategy Areas
from which the waste will be obtained. The results of this BPEO evaluation
will be a material consideration in the planning process for such developments. Where existing or proposed regional or nationalscale
facilities will result in waste movement between Waste Strategy Areas,
then consideration of the proposed waste exports and imports must be
included in the BPEO process, as described in the following paragraphs. Waste Export and import |
|
|
|||||||||
|
|||||||||
|
|