National Waste Strategy

North East Area Waste Plan

SEPA :: Home Page
spacer
Contents Page Contents Page
Previous Page Previous Page
Next Page Next Page
spacer
spacer   spacer
 

Key Acronyms

Terms and abbreviations most frequently used. (A full glossary of terms is presented in Annex 1).

AWP - Area Waste Plan
Each Group was charged with producing an Area Waste Plan for that respective area, its aim is to provide a strategic plan for the waste arising in that area based on National Waste Strategy: Scotland principles.

BMW - Biodegradable Municipal Waste
In the context of this plan, waste collected by local authorities that is capable of undergoing anaerobic or aerobic decomposition, such as food or garden waste and paper and cardboard, i.e. waste that rots. This is generally accepted to be 60% of MSW.

BPEO - Best Practicable Environmental Option
The National Waste Strategy: Scotland 1999 defined the BPEO as the outcome of a systematic and consultative decision-making procedure, which emphasises the protection, and conservation of the environment across land, air and water. The BPEO procedure establishes, for a given set of objectives, the option that provides the most benefits or the least damage to the environment as a whole, at acceptable cost, in the long term as well as in the short term.

MSW - Municipal Solid Waste
In the context of this plan, MSW includes household and other waste under the control of the local authorities or agents acting on their behalf.

SWMBA - Strategic waste management baseline assessment
An assessment and description of existing waste management in an area. Examines waste arisings; waste management facilities and capacities; imports and exports of waste; existing contract arrangements and demographics such as population and household numbers.

NEWSAG - North East Waste Strategy Area Group
A key component of the National Waste Strategy: Scotland was the establishment of 11 Area Waste Groups across Scotland. The groups are charged with making the National Strategy a reality at a local level, developing local solutions in response to local needs. The North East Waste Strategy Area Group consists of the following partners:

  • Aberdeenshire Council
  • Aberdeen City Council
  • Moray Council
  • Scottish Environment Protection Agency
  • Scottish Enterprise Grampian
  • Scottish Enterprise Moray Badenoch and Strathspey.
 
spacer
spacer
Contents Page Contents Page
Previous Page Previous Page
Next Page Next Page
spacer