Orkney and Shetland Area Waste Plan |
|
|||||||||
|
3.5 Implementing the BPEO for MSW Taking forward the implementation of BPEO will require an ongoing partnership approach between the two local authorities and other local stakeholders to achieve the targets set out by the area's BPEO. The crucial next step is to work up detailed Implementation Plans that will flesh out the detail of new facilities required, the associated costs, and a detailed timetable for their delivery. Table 3.3 - Indicative Key facilities required to deliver BPEO
(1) All figures in tonnes per annum. Exact capacities required will be dependant on several variables including waste composition, waste growth, participation rates in recycling schemes, and success of waste prevention schemes. Capacities are only for MSW, these capacities will increase if other wastes are managed at these facilities.
In taking forward this BPEO there will be significant linkage with the land use planning system to secure approval for appropriate sites and projects. A number of 'pilot projects' are also likely to be introduced to investigate the efficacy of alternative waste-collection methods. This will allow evaluation of a number of options before firming up on specific techniques. Table 3.3 sets out a preliminary indication of the key facilities identified at this stage that are required to meet the BPEO and which will have land use planning implications. |
|
|
|||||||||
|
|||||||||
|
|