3.5 Implementing the BPEO for MSW

Taking forward the implementation of BPEO will require an ongoing partnership approach between the two local authorities and other local stakeholders to achieve the targets set out by the area's BPEO. The crucial next step is to work up detailed Implementation Plans that will flesh out the detail of new facilities required, the associated costs, and a detailed timetable for their delivery.

Table 3.3 - Indicative Key facilities required to deliver BPEO

Requirements Capacity (1) Timescale Notes
Non-hazardous landfill (Shetland) tbc - existing site 36,000 By 2005 Capacity required depends largely on non-MSW arisings requiring disposal (depends in turn on outcome of non-MSW BPEO assessment/s)
Expanded network of recycling bring sites in both island groups Circa. 2800 by 2010 Phased, 2002 - 2010 Requires close Community consultation
In-vessel composting facility (Orkney) 1000 by 2005 By end 2005 May require specific site
May be modular or single vessel depending on implementation plan.

(1) All figures in tonnes per annum. Exact capacities required will be dependant on several variables including waste composition, waste growth, participation rates in recycling schemes, and success of waste prevention schemes. Capacities are only for MSW, these capacities will increase if other wastes are managed at these facilities.


Action 21
Develop detailed AWP Implementation Plans for each of the Orkney and Shetland Island groups.

In taking forward this BPEO there will be significant linkage with the land use planning system to secure approval for appropriate sites and projects. A number of 'pilot projects' are also likely to be introduced to investigate the efficacy of alternative waste-collection methods. This will allow evaluation of a number of options before firming up on specific techniques. Table 3.3 sets out a preliminary indication of the key facilities identified at this stage that are required to meet the BPEO and which will have land use planning implications.

 