| |
4.8 Disposal
Significant quantities of non-MSW are landfilled in Orkney
and Shetland. The majority of these wastes are construction and demolition
or oil-related. The Landfill Directive may require engineering improvements
that threaten the viability of some of the smaller existing inert sites.
Actions 19 and 34 are intended to address the provision of sufficient
forward landfill capacity for non-hazardous and inert wastes as required.
There could be wastes currently disposed of to landfill which the landfill
directive will ban from landfill in future years. The Orkney and Shetland
WSAG will ensure work is initiated to identify these wastes, and understand
future infrastructure requirements.
|
|