Type of application
|
Stages at which input can be made
|
|
New Installation Application
These are applications for proposals to begin operation of a site covered by the PPC regime.
|
Upon receipt of an application SEPA will inform the applicant of the need to advertise the application in a local newspaper to the installation and in the Edinburgh Gazette. Members of the public are then invited to examine the application held in the local Public Register and make comments within 28 days of the date of advertisement.
Upon determination of the application SEPA will consult on the draft permit, including the draft decision document. SEPA will provide this material on its website and invite comments on these documents over a 28 day period.
To view ongoing Public Participation Directive consultations click here
|
|
Existing Installation Application
These are applications from operators who have been in operation for a number of years and are transferring into the PPC regime during the relevant application window.
|
Upon receipt of an application SEPA will inform the applicant of the need to advertise the application in a local newspaper to the installation and in the Edinburgh Gazette. Members of the public are then invited to examine the application held in the local Public Register and make comments within 28 days of the date of advertisement.
SEPA will not consult on the draft permit and decision document. The permit will be published on the local public register following determination in line with the provisions of Schedule 8 of the Regulations.
|
|
Substantially Changed Installations
These are applications from operators of existing PPC permitted installations who propose to make a “substantial change” to their activity.
|
Upon receipt of an application SEPA will inform the applicant of the need to advertise the application in a local newspaper to the installation and in the Edinburgh Gazette. Members of the public are then invited to examine the application held in the local Public Register and make comments within 28 days of the date of advertisement.
Upon determination of the application SEPA will consult on the draft revised conditions / permit, including the draft decision document. SEPA will provide this material on its website and invite comments on these documents over a 28 day period.
To view ongoing Public Participation Directive consultations click here
|
|
Changes to Emission Limits
SEPA is required to review permits from time to time. Where SEPA reviews a permit and decides that the pollution caused by the installation is of such significance that the existing emission limit values of the permit need to be revised or new such values need to be included in the permit then such changes require public consultation.
|
Upon determining the changes to the permit required to enforce new emission limit values SEPA will consult on the draft revised conditions / permit, including a draft decision document. SEPA will provide this material on its website and invite comment on these documents over a 28 day period.
SEPA will not consult on changes to emission limits required to be made on an emergency basis, or where emission limits are lowered as a result in advances in management within the installation concerned.