Developing the first plans
Shadow River Basin Management Plan
During 2001 and 2002 the Scottish Government funded research to
help inform river basin management planning in Scotland.
Consultants used available information to produce a Shadow River
Basin Management Plan for SEPA's south west area that met, as far
as possible at the time, Water Framework Directive (WFD)
requirements for a river basin management plan.
- Shadow
River Basin Management Plan

This study examines the logistics of river basin management by
creating a shadow river basin plan for the south-west of Scotland.
In addition, a Plan Preparation Report was produced to accompany
the Shadow River Basin Management Plan.
- Plan
Preparation Report

Outlines the process of production; identifies positive and
negative aspects of the work; and makes recommendations for future
river basin planning work.
River Basin Planning Strategies
Following a public consultation in 2004 and stakeholder events
held during 2003, SEPA published a River Basin Planning Strategy
for the Scotland river basin district and a River Basin Planning
Framework for the Solway Tweed river basin district in 2005. A
digest of responses to each consultation is available below.
Characterisation and Impacts Analysis
An environmental and economic characterisation for each river
basin district was published in March 2005 and at the time,
presented the most detailed descriptions ever produced on the
pressures and impacts on the water environment. These reports can
be accessed below.
Significant Water Management Issues
In 2007, a report on the significant water management issues
that put our ability to achieve the objectives of the Water
Framework Directive (WFD) at risk was published. More information
on this is available here.
Draft River Basin Management Plans
|
Interactive Map
|
|
Web-based interactive
map – this application works best when viewed with Internet
Explorer 7
(Please note that first time you load the application it will
take some time for the screen to appear. However you should find
that on subsequent occasions it loads much more quickly.)
|
|
Scotland River Basin District
|
Consultation closed
|
|
Draft river
basin district
plan
|
(2.1mb)
|
|
| Annexes: |
|
|
|
(189kb)
|
|
|
(1mb)
|
|
|
(278kb)
|
|
|
(517kb)
|
|
|
(790kb)
|
|
|
(204kb)
|
|
|
(233kb)
|
|
|
(322kb)
|
|
|
(150kb)
|
|
|
(210kb)
|
|
|
(183kb)
|
|
Area Management Plans:
|
|
|
|
(1.4mb)
|
|
|
(1.4mb)
|
|
|
(1.5mb)
|
|
|
(1.7mb)
|
|
|
(1.6mb)
|
|
|
(1mb)
|
|
|
(1.3mb)
|
|
|
(1.5mb)
|
|
Scotland RBMP SEA Environmental Report
|
Consultation closed
|
|
Under the Environmental Assessment (Scotland) Act 2005, a
strategic environmental assessment (SEA) of the effects the
Scotland RBMP may have on the wider environment is required. An
Environmental Report has been prepared which meets the requirements
under this legislation and is available for download by clicking on
the links below. The consultation is now closed.
|
|
Scotland RBMP Impact Assessment
|
|
Document on the Impact Assessment of the River Basin Management
Plan for the Scotland River Basin District: Summary Report relating
to the implementation of the Water Framework Directive and River
Basin Management Planning process in Scotland
|
|
Solway Tweed RBMP SEA Environmental Report
|
Consultation closed
|
|
Under the the Environmental Assessment (Scotland) Act
2005 and the Environmental Assessment of Plans and
Programmes Regulations 2004, a strategic environmental
assessment (SEA) of the effects the Solway Tweed RBMP may have on
the wider environment is required. An Environmental Report has been
prepared which meets the requirements under this legislation and is
available for download by clicking on the links below. This
consultation is now closed.
|
|
|
Solway Tweed RBMP Impact Assessment
|
|
Document on the Impact Assessment of the River Basin Management
Plan for the Solway Tweed River Basin District relating to the
implementation of the Water Framework Directive and River Basin
Management Planning process in Solway Tweed
|
Summary of responses to River Basin Management Plan
consultations
A summary of the consultation responses to each plan and the
changes made to the plans is available here:
Scotland RBMP
– summary of responses
(618kb)
Solway Tweed
RBMP – summary of responses
(814kb)