Content Search
You can also perform this search within our Document Library
You searched for WA 0859 3970 0884 Kontraktor Rumah Kayu 4×6 Sragen Sragen , and found 25 results.
Page 3 of 3 pages
SEPA Planning
What we do
SEPA have various statutory responsibilities for land use planning in Scotland and cross-border. Through these responsibilities, we deliver against SEPA’s five strategic priorities - net zero, climate resilience, water environment, resource efficiency and business environmental performance. In our planning role, we aim to help:
Protect Scotland’s environment and communities from harm.
Help
Help information
Can I view the register full screen?No. The register can only be viewed within the set frame.
Can I hide the search menu on the right?No, the search menu on the right hand side is fixed.
Why can’t I view my own property?The register is designed to support SEPA’s regulation of the reservoir industry and to support strategic level decision making. It is not suitable for assessing fl
Position Statement: Elevated buildings in areas of flood risk
What is an elevated building?
A building where structures such as pillars or stilts are used to raise it above the expected flood water level. The ground below the building remains at risk of flooding and allows for the free flow of water.
Context for this position statement
This position statement constitutes part of ‘relevant SEPA advice’ as referred to in criterion a) iv of the National Plannin
Help Information
Can I view the maps full screen?No. The maps can only be viewed within the set frame.
Why has the background on the maps changed (2019)?Due to changes to the contract associated with the supply of the background mapping to SEPA, we now have a different background on display. This change took place in December 2018. There are no significant changes to what is displayed, and the mapping presented ha
Technical guidance
Further technical guidance
This page brings together a number of ancillary guidance documents and previous email bulletin information relating to modelling of marine fish-farms for CAR licence applications.
Auxiliary biomass sampling transect
In areas where the tidal residual current is weak, the auxiliary transect (site-specific sampling 2) may be aligned along a bearing reciprocal to the primary