Skip to main content

Content Search

You can also perform this search within our Document Library

You searched for WA 0821 1305 0400 Order Material Geoteknik Geocomposite Karimun Kepulauan Riau [[Tiga Pillar]] , and found 37 results.

Page 4 of 4 pages

Page icon Soil

Scotland’s soils are an important natural resource providing a wide range of benefits for people, the environment and the economy. It is essential to protect soils to ensure they are able to continue to provide these benefits for future generations. Why are soils important? Soils are a vital natural resource as they carry out a wide range of essential functions, such as growing food and timber, co

Page icon Dalgety Bay reports

Radioactive items have been detected on Dalgety Bay since at least 1990. Many surveys have been undertaken on the beach to determine the potential numbers of items present and possible implications for public health. Management options Strategy for stakeholder engagement PDF (25 kb) DIO outline management options appraisal - final report PDF (2.57mb) Dalgety Bay appropriate person summ

Page icon SEPA Planning

What we do SEPA have various statutory responsibilities for land use planning in Scotland and cross-border. Through these responsibilities, we deliver against SEPA’s five strategic priorities - net zero, climate resilience, water environment, resource efficiency and business environmental performance. In our planning role, we aim to help: Protect Scotland’s environment and communities from harm.

Page icon Invasive non-native species

What are invasive non-native species? Non-native species (NNS) are plants and animals which have been introduced (accidentally or deliberately) outside of their native range through human activity. Many non-native species contribute positively to our lives, as livestock, crops, timber, garden plants or pets. However, a small proportion (10-15%) of non-native species spread rapidly and cause damage

Page icon Publications

A list of publications relating to river basin planning in Scotland and the Solway Tweed.

A list of publications relating to river basin planning in Scotland and the Solway Tweed. River basin management planning publications This page provides a full list of RBMP publications listed in order from the most recent to the earliest work. Date Publication 2024 Statement of consultation opportunities during development of the next River Basin Management Plan for Scotland. 2024 River Basin Management Planning in the Solway Tweed, Statement of Consultation Steps.

Page icon Contaminated land

The management and remediation of contaminated land that, in its current state, is causing or has the potential to cause significant harm or significant pollution of the water environment, is regulated by legislation contained within the Environmental Protection Act (1990) known as Part IIA. We have certain responsibilities within the scope of this legislation to regulate activities and assist in the management and remediation of contaminated land.

The management and remediation of contaminated land that, in its current state, is causing or has the potential to cause significant harm or significant pollution of the water environment, is regulated by legislation contained within the Environmental Protection Act (1990) known as Part IIA. We have certain responsibilities within the scope of this legislation to regulate activities and assist in the management and remediation of contaminated land. Contaminated land can present significant threats to the environment and risks to users of the land. Land can become contaminated by a variety of substances, from heavy metals to agricultural waste. The environmental, financial and legal implications of this can be substantial. The management and remediation of contaminated land that, in its current state, is causing or has the potential to cause

Page icon Technical concepts

Part IIA introduces a number of technical concepts and some key concepts are considered in this section. A number of methods and models are available to assist in the derivation of site specific assessment criteria, as highlighted in the other "technical concepts and tools" sections

Part IIA introduces a number of technical concepts and some key concepts are considered in this section. A number of methods and models are available to assist in the derivation of site specific assessment criteria, as highlighted in the other "technical concepts and tools" sections Part II A introduces a number of technical concepts and some key concepts are considered in this section. A number of methods and models are available to assist in the derivation of site specific assessment criteria, as highlighted in the other 'technical concepts and tools' sections. Site specific risk assessment A risk assessment represents the structured gathering of information in order to for