Content Search
You can also perform this search within our Document Library
You searched for WA 0852 2611 9277 Fee Pembuatan Plafon Gypsum Plus Bahan Terpercaya Ciracas Jakarta Timur , and found 6 results.
Changes to permits
Variations
A permit holder can apply for a variation to change the conditions of their permit.
Administrative variations
An administrative variation is a change to permit conditions which does not require SEPA to undertake technical assessment, for example, changing the name of a chemical, lowering a discharge limit, changing an effective date.
These changes do not increase the environmental risk
Reservoirs
The majority of dams will require an authorisation from SEPA under "The Water Environment (Controlled Activities)(Scotland) Regulations 2011 (CAR). This authorisation number will start CAR/.../... If you don't have a CAR authorisation for your dam, then you should contact your local SEPA team to discuss this.
You can find more advice on impoundments and water resources authorisations on our Enviro
SEPA Data publication
List of data published by SEPA. Links to access data itself or applications that show the data
List of data published by SEPA.
Links to access data itself or applications that show the data
We publish a range of datasets related to the environment, and we are continually reviewing and adding to this list. Please use our online form to contact us if you cannot find the dataset you require.
We have a Corrections policy for handling revisions and corrections to the statistical summaries we produce. Our User engagement policy specifies how we engage with users to ensure our statistics ar
Aquaculture Regulatory
The role of regulation in aquacultire and the process for applying for a licence to operate a fish farm.
The role of regulation in aquacultire and the process for applying for a licence to operate a fish farm.
Emamectin Benzoate position
The below statement sets out our interim position on the environmental standards that we will apply when assessing new applications to discharge or increase volumes of in-feed sea lice medicine containing emamectin benzoate.
We have requested that the UK Technical Advisory Group (UKTAG) consider all the available scientific evidence and make recommendations to Scottish
Position Statement: Elevated buildings in areas of flood risk
What is an elevated building?
A building where structures such as pillars or stilts are used to raise it above the expected flood water level. The ground below the building remains at risk of flooding and allows for the free flow of water.
Context for this position statement
This position statement constitutes part of ‘relevant SEPA advice’ as referred to in criterion a) iv of the National Plannin
Technical guidance
Further technical guidance
This page brings together a number of ancillary guidance documents and previous email bulletin information relating to modelling of marine fish-farms for CAR licence applications.
Auxiliary biomass sampling transect
In areas where the tidal residual current is weak, the auxiliary transect (site-specific sampling 2) may be aligned along a bearing reciprocal to the primary