Content Search
You can also perform this search within our Document Library
You searched for WA 0812 2782 5310 Order Pembuatan Gerobak Jualan Sepeda Motor Kebakkramat Karanganyar , and found 27 results.
Page 3 of 3 pages
Technical guidance
Further technical guidance
This page brings together a number of ancillary guidance documents and previous email bulletin information relating to modelling of marine fish-farms for CAR licence applications.
Auxiliary biomass sampling transect
In areas where the tidal residual current is weak, the auxiliary transect (site-specific sampling 2) may be aligned along a bearing reciprocal to the primary
Discharges of bath treatment medicine residues from wellboats
From Monday 9 November 2020, marine finfish farm operators must apply to SEPA for permission to discharge medicine residues from wellboats. Licences will no longer be issued for wellboat discharges by the Marine Directorate.
All licences previously issued by the Marine Directorate will automatically transfer to us on Monday 30 November 2020 and be regulated under the Water Environment (Controlled
Reservoirs
The majority of dams will require an authorisation from SEPA under "The Water Environment (Controlled Activities)(Scotland) Regulations 2011 (CAR). This authorisation number will start CAR/.../... If you don't have a CAR authorisation for your dam, then you should contact your local SEPA team to discuss this.
You can find more advice on impoundments and water resources authorisations on our Enviro
Renewable
Information on the different types of renewable power and our role in regulating them.
Information on the different types of renewable power and our role in regulating them.
Scottish Government has made decarbonisation of the energy system by 2050 a core aspect of the Scottish Energy Strategy and commits us to ensuring that by 2030, the equivalent of 50% of the total energy for Scotland’s heat, transport and electricity consumption would be supplied from renewable sources and Scotland’s Climate Change Plan sets out an ambitious trajectory for decarbonising heat, where
Publications
A list of publications relating to river basin planning in Scotland and the Solway Tweed.
A list of publications relating to river basin planning in Scotland and the Solway Tweed.
River basin management planning publications
This page provides a full list of RBMP publications listed in order from the most recent to the earliest work.
Date
Publication
2024
Statement of consultation opportunities during development of the next River Basin Management Plan for Scotland.
2024
River Basin Management Planning in the Solway Tweed, Statement of Consultation Steps.
Technical concepts
Part IIA introduces a number of technical concepts and some key concepts are considered in this section. A number of methods and models are available to assist in the derivation of site specific assessment criteria, as highlighted in the other "technical concepts and tools" sections
Part IIA introduces a number of technical concepts and some key concepts are considered in this section.
A number of methods and models are available to assist in the derivation of site specific assessment criteria, as highlighted in the other "technical concepts and tools" sections
Part IIA introduces a number of technical concepts and some key concepts are considered in this section.
A number of methods and models are available to assist in the derivation of site specific assessment criteria, as highlighted in the other 'technical concepts and tools' sections.
Site specific risk assessment
A risk assessment represents the structured gathering of information in order to form
Modelling
Marine aquaculture modelling
Computer modelling is used as a guide to determining licensed discharge quantities of anti-parasitic chemicals and organic waste arising from marine fish-farm operations.
The modelling tools promoted by SEPA provide robust predictions in most cases, requiring relatively little site-specific information. Nevertheless, the quality of the model outputs is dependent upon g