Skip to main content

Content Search

You can also perform this search within our Document Library

You searched for 四川长虹2025年1月2号到1月27号股价 , and found 54 results.

Page 2 of 6 pages

Page icon 2050 Climate Group Sustainable Growth Agreement

Find information about our Sustainable Growth Agreement (SGA) with 2050 Climate Group here.

Find information about our Sustainable Growth Agreement (SGA) with 2050 Climate Group here. The 2050 Climate Group is Scotland’s youth climate group, which aims to lead a social movement by engaging, educating and empowering Scotland’s Future Leaders to take action on climate change. The group is a collection of young professionals across Scotland who all share a commitment to climate change mitigation and adaptation and accelerating Scotland’s transition to a low carbon economy. The 205

Page icon Radioactive substances online notifications and applications

We're in the process of moving to our Beta website and information on applying for authorisations is now also available there in a new radioactive substances section. Use the back button in your browser to return to this page. Links to our forms and guidance will remain here for a period of time to support the transition.   Notifications If you wish to notify SEPA of certain lower risk r

Page icon Technical concepts

Part IIA introduces a number of technical concepts and some key concepts are considered in this section. A number of methods and models are available to assist in the derivation of site specific assessment criteria, as highlighted in the other "technical concepts and tools" sections

Part IIA introduces a number of technical concepts and some key concepts are considered in this section. A number of methods and models are available to assist in the derivation of site specific assessment criteria, as highlighted in the other "technical concepts and tools" sections Part II A introduces a number of technical concepts and some key concepts are considered in this section. A number of methods and models are available to assist in the derivation of site specific assessment criteria, as highlighted in the other 'technical concepts and tools' sections. Site specific risk assessment A risk assessment represents the structured gathering of information in order to for

Page icon Dalgety Bay reports

Radioactive items have been detected on Dalgety Bay since at least 1990. Many surveys have been undertaken on the beach to determine the potential numbers of items present and possible implications for public health. Management options Strategy for stakeholder engagement PDF (25 kb) DIO outline management options appraisal - final report PDF (2.57mb) Dalgety Bay appropriate person summ

Page icon Publications

A list of publications relating to river basin planning in Scotland and the Solway Tweed.

A list of publications relating to river basin planning in Scotland and the Solway Tweed. River basin management planning publications This page provides a full list of RBMP publications listed in order from the most recent to the earliest work. Date Publication 2024 Statement of consultation opportunities during development of the next River Basin Management Plan for Scotland. 2024 River Basin Management Planning in the Solway Tweed, Statement of Consultation Steps.

Page icon Reports

Radioactivity in Food and the Environment (RIFE) reports Title Year RIFE 30 2025 RIFE 29 2024 RIFE 28 (View accessible version) 2023 RIFE 27 2022 RIFE 27 appendix 2022 RIFE 27 Errata 2022 RIFE 26 2021 RIFE 26 appendix 2021 RIFE 26 Errata 2021 RIFE 25 2020 RIFE 25 appendix 2020 RIFE 25 Errata 2020 RIFE 24 2019 RIFE 24 appendix 2019 RIFE 24 Errata 2019 RIFE Trends

Page icon How we forecast flooding

SEPA works with the Met Office to forecast flooding in Scotland, providing accurate and timely information to help emergency responders, local authorities, the public and other organisations prepare for flooding.

SEPA works with the Met Office to forecast flooding in Scotland, providing accurate and timely information to help emergency responders, local authorities, the public and other organisations prepare for flooding. Scottish Flood Forecasting Service This strategic partnership between the Scottish Environment Protection Agency (SEPA) and the Met Office combines hydrological and meteorological information for the first time, so that both organisations can share their expertise to improve the accuracy of flood forecasts for the whole of Scotland. We collect data from our network of over 250 rainfall, river and

Page icon Zero Waste

SEPA works with the Scottish Government and Zero Waste Scotland to achieve the objectives and targets of the Zero Waste Plan, published in 2010. We have a wide range of responsibilities including regulating waste management activities such as landfills, incinerators and the export of waste, administering the producer responsibility schemes for packaging, WEEE and batteries, collecting and interpre

Page icon Guidance and reports

SEPA guidance Guidance on decommissioning of non-nuclear facilities. Principles on surrendering permits and registrations for radioactive substances actvities. Satisfying the optimisation requirement and the role of best practicable means. Guidance on monitoring for heterogeneous Radium-226 sources resulting from historic luminising or waste disposal sites. Management of end-of-life smoke detecto

Page icon Position Statement: Elevated buildings in areas of flood risk

What is an elevated building? A building where structures such as pillars or stilts are used to raise it above the expected flood water level. The ground below the building remains at risk of flooding and allows for the free flow of water. Context for this position statement This position statement constitutes part of ‘relevant SEPA advice’ as referred to in criterion a) iv of the National Plannin