Content Search
You can also perform this search within our Document Library
You searched for ✅조원동룸싸롱【【O1O~63④3~35③⑥】】조원동룸살롱 조원동노래빠 조원동퍼블릭 조원동쓰리노 조원동셔츠룸 조원동가라오케✅ , and found 48 results.
Page 3 of 5 pages
Water
Scotland's water is famed worldwide. It's critical in the production and branding of some of our biggest exports, and a big draw for tourists. The water environment in Scotland is generally in good condition. However, there are environmental problems, including diffuse pollution, discharges of waste water, abstractions and historic physical alterations.
The management of water plays a significant
Publications
A list of publications relating to river basin planning in Scotland and the Solway Tweed.
A list of publications relating to river basin planning in Scotland and the Solway Tweed.
River basin management planning publications
This page provides a full list of RBMP publications listed in order from the most recent to the earliest work.
Date
Publication
2024
Statement of consultation opportunities during development of the next River Basin Management Plan for Scotland.
2024
River Basin Management Planning in the Solway Tweed, Statement of Consultation Steps.
Material facility (MF)
Guidance and forms for operators of material recycling facilities who need to submit their waste data returns
Guidance and forms for operators of material recycling facilities who need to submit their waste data returns
Quarter
Reporting period
Date for submission to SEPA
1
1 January - 31 March
30 April
2
1 April - 30 June
31 July
3
1 July - 30 September
31 October
4
1 October - 31 December
31 January
Material facilities (MF) are required to comply with the Materials Recovery Code. The code sets out sampling and reporting requirements for in scope materials facilities.
Material facilitie
Licensed and permitted sites
All operators holding a Waste Management Licence and some site operators holding a Pollution Prevention and Control permit are required to submit waste data returns to SEPA on a quarterly or annual basis.
Late submission or submissions of poor quality data may affect compliance scores.
Reporting periods and submission deadlines
Quarter
Reporting Period
Deadline for submission to SEPA
Renewable
Information on the different types of renewable power and our role in regulating them.
Information on the different types of renewable power and our role in regulating them.
Scottish Government has made decarbonisation of the energy system by 2050 a core aspect of the Scottish Energy Strategy and commits us to ensuring that by 2030, the equivalent of 50% of the total energy for Scotland’s heat, transport and electricity consumption would be supplied from renewable sources and Scotland’s Climate Change Plan sets out an ambitious trajectory for decarbonising heat, where
PPC Part B activities
If you intend applying for a Part B permit or hold a permit already, this section will guide you through your obligations.
If you intend applying for a Part B permit or hold a permit already, this section will guide you through your obligations.
If you intend applying for a Part B permit or hold a permit already, this section will guide you through your obligations.
Part B activities are those listed under Part B within Schedule 1 of the Pollution Prevention and Control (Scotland) Regulations 2012 (PPC2012).
These are generally smaller industrial activities and operators of Part B activities require a PPC permit in order to be able to und
Use of waste on single site for soil improvement
This activity applies to the use of waste on land for the purpose of soil improvement (single location).
Authorisation level
Registration
Fit and Proper Person tests
Fit and Proper Person tests apply to this activity. You will be asked in your application if you have any relevant convictions held by you or any additional persons.
Read more about Fit and Proper Person tests in our guidance on who c
Use of waste on multiple sites for soil improvement
This activity applies to the use of waste on land for the purpose of soil improvement at multiple farms or sites.
Authorisation level
Permit
Public consultation
We may publicly consult on applications that, due to their nature or location, have higher likelihood of environmental impact and community impact.
Read more about public participation and engagement
Fit and Proper Person tests
Fit and Pro
Guidance and reports
SEPA guidance
Guidance on decommissioning of non-nuclear facilities
Principles on Surrendering Permits and Registrations under the Environmental Authorisations (Scotland) Regulations 2018
Satisfying the optimisation requirement and the role of best practicable means
Guidance on monitoring for heterogeneous Radium-226 sources resulting from historic luminising or waste disposal sites
Management of
Authorisation guidance
Pen layout changes at marine finfish farms
Published: March 2024
1. Authorisation of pen layout changes
1.1 All pen layout changes require prior-authorisation from SEPA. To obtain authorisation, operators must apply to SEPA to very their existing SEPA permit.
1.2 All such applications will be subject to screening, environmental risk assessment (see section 2). This assessment will determine whethe