Content Search
You can also perform this search within our Document Library
You searched for ✍신도림룸싸롱【【O1O~63④3~35③⑥】】신도림룸살롱 신도림노래빠 신도림퍼블릭 신도림쓰리노 신도림호빠 신도림셔츠룸 신도림가라오케✍ , and found 63 results.
Page 3 of 7 pages
PPC application forms
On these pages you will find all the application forms you need to apply, vary, transfer and surrender permits which authorise the activities listed in Schedules 1 and 2 of the Pollution Prevention and Control (Scotland) Regulation 2012.
There are two broad categories of PPC permits:
PPC Part A activities: Activities which require these permits include landfills and intensive agriculture installa
Print Footer
Disclaimer and Terms and Conditions All intellectual property rights are owned by SEPA or its licensors. The maps cannot be used for commercial purposes, by value added resellers or for income generating purpose. A full list of terms and conditions is available from the flood maps or by contacting flooding@sepa.org.uk.
The maps are indicative and of a strategic nature. Whilst all reasonable effor
Long-term river water quality indicator
SEPA publishes a long-term river water quality indicator, based on a network of sites covering 253 water bodies (rivers or sections of rivers). This indicator is based on a consistent set of five water quality parameters which are sensitive to organic pollution, nutrients and toxic substances, and which provide a measure of species diversity across approximately 10% of all water bodies.
SEPA publishes a long-term river water quality indicator, based on a network of sites covering 253 water bodies (rivers or sections of rivers).
This indicator is based on a consistent set of five water quality parameters which are sensitive to organic pollution, nutrients and toxic substances, and which provide a measure of species diversity across approximately 10% of all water bodies.
Monitoring
In 2011, the Scottish Environment Protection Agency (SEPA) established an indicator of river water quality based on a network of sites covering 253 water bodies (rivers or sections of rivers), which account for approximately 10% of all water bodies. The indicator is based on a consistent set of five water quality parameters which are sensitive to organic pollution, nutrients and toxic s
Energy Savings Opportunities Scheme
An overview of the Energy Saving Opportunities Scheme (ESOS) and how to find out if your organisation qualifies.
An overview of the Energy Saving Opportunities Scheme (ESOS) and how to find out if your organisation qualifies.
ESOS Phase 3 Compliance Deadline has been extended to 5 June 2024
The Energy Saving Opportunities Scheme (ESOS) is a mandatory energy assessment scheme for organisations in the United Kingdom that are regarded as a ‘large undertaking’.
The scheme was established to implement Article 8(4, 5 and 6) of the EU Energy Efficiency Directive (2012/27/EU). We are now nearing the third compliance phase of t
2050 Climate Group Sustainable Growth Agreement
Find information about our Sustainable Growth Agreement (SGA) with 2050 Climate Group here.
Find information about our Sustainable Growth Agreement (SGA) with 2050 Climate Group here.
The 2050 Climate Group is Scotland’s youth climate group, which aims to lead a social movement by engaging, educating and empowering Scotland’s Future Leaders to take action on climate change. The group is a collection of young professionals across Scotland who all share a commitment to climate change mitigation and adaptation and accelerating Scotland’s transition to a low carbon economy. The 205
Penalties imposed and undertakings accepted
Type of penalty
Number imposed* (running total)
Total amount
Fixed monetary penalties
120
£62,200
Variable monetary penalties
12
£47,711.78
* Imposed: this is the number of penalties that have been served since 2016.
Type of undertaking
Number accepted (running total)
Number of non-compliance certificates imposed(running total)
Enforcement undertakings
28
1
VMP undertakings
Not
Project publications
Links to the LIFE SMART Waste project's published reports, tools and supporting materials.
Links to the LIFE SMART Waste project's published reports, tools and supporting materials.
Reports, tools and resources
Follow the links to published LIFE SMART Waste project reports:
Online capacity building (Actions B1-B2 & B9)
Action B2 - Intelligence Gathering Strategy, 2015
Tools, Approaches & Techniques (Actions B3
Material facility (MF)
Guidance and forms for operators of material recycling facilities who need to submit their waste data returns
Guidance and forms for operators of material recycling facilities who need to submit their waste data returns
Quarter
Reporting period
Date for submission to SEPA
1
1 January - 31 March
30 April
2
1 April - 30 June
31 July
3
1 July - 30 September
31 October
4
1 October - 31 December
31 January
Material facilities (MF) are required to comply with the Materials Recovery Code. The code sets out sampling and reporting requirements for in scope materials facilities.
Material facilities are like
Water
Scotland's water is famed worldwide. It's critical in the production and branding of some of our biggest exports, and a big draw for tourists. The water environment in Scotland is generally in good condition. However, there are environmental problems, including diffuse pollution, discharges of waste water, abstractions and historic physical alterations.
The management of water plays a significant
Publications
A list of publications relating to river basin planning in Scotland and the Solway Tweed.
A list of publications relating to river basin planning in Scotland and the Solway Tweed.
River basin management planning publications
This page provides a full list of RBMP publications listed in order from the most recent to the earliest work.
Date
Publication
2024
Statement of consultation opportunities during development of the next River Basin Management Plan for Scotland.
2024
River Basin Management Planning in the Solway Tweed, Statement of Consultation Steps.