Document Search
You can also perform this search within our Content Pages
You searched for An experimental study on the comparative assessment of hydraulic bulge test analysis methods , and found 114 results.
Page 8 of 12 pages
33 Scotland River Basin District Appropriate Assessment
The river basin management plan for the Scotland river basin district 2009–2015 Appropriate Assessment Contents 1. Introduction 2 2. Scotland river basin district and European sites 4 3. Method 4 4.
Dalgety Bay risk assessment group meeting - 16 March 2009
DB RAG FINAL 16 March 2009 Note of Meeting Dalgety Bay Risk Assessment Group DATE: 16 March 2009 TIME: 11.00 LOCATION: Surgeons Hall, Edinburgh SEPA HPA FSA MoD/Contractors George Hunter Joanne x Will
Prospective Dose Assessment - Faslane and Coulport
Prospective Dose Assessment – Faslane and Coulport Model Used – PC Cream 2008 v1.2.0.44 Habit Survey(s) used – 2011 and 2006 Discharge data: 3 Coulport Gaseous: tritium ( H) 20 GBq from a stack height
Appendix F: NFM assessment calculations
River Dee restoration, cbec UK Ltd, October 2013 APPENDIX F NFM ASSESSMENT CALCULATIONS River Dee restoration, cbec UK Ltd, October 2013 OVERVIEW This appendix contains additional detail to explain h
Appendix L: Final options assessment
River Nith restoration, cbec UK Ltd, October 2013 APPENDIX L FINAL ASSESSMENT OF OPTIONS River Nith restoration, cbec UK Ltd, October 2013 Table L1 Ranking of options following final assessment and s
Appendix H: Photos NFM assessment
River Nith restoration, cbec UK Ltd, October 2013 APPENDIX H Catchment photographs relating to NFM assessment River Nith restoration, cbec UK Ltd, October 2013 Figure H.1: Section of embankment locat
Appendix H: Final assessment of options
River Dee restoration, cbec UK Ltd, October 2013 APPENDIX H FINAL ASSESSMENT OF OPTIONS River Dee restoration, cbec UK Ltd, October 2013 Table H1 Ranking of options following final assessment and sum
IPPC H4 (part 2): Horizontal guidance for odour Part 2 - Assessment and control
Technical Guidance Note IPPC H4 Integrated Pollution Prevention and Control (IPPC) DRAFT Horizontal Guidance for Odour Part 2 – Assessment and Control i IPPC Preliminary Pages Commissioning Organisat
Appendix E: NFM assessment results
River Dee restoration, cbec UK Ltd, October 2013 APPENDIX E NFM ASSESSMENT RESULTS River Dee restoration, cbec UK Ltd, October 2013 Table E1 Predicted changes in flood peak magnitude resulting from e
Partial Business and Regulatory Impact Assessment (BRIA)
Partial Business and Regulatory Impact Assessment (BRIA) TITLE OF PROPOSAL Better Environmental Regulation: Proposals for a new Integrated Framework of Environmental Regulation and Future Funding Arra