Skip to main content

Document Search

You can also perform this search within our Content Pages

You searched for An experimental study on the comparative assessment of hydraulic bulge test analysis methods , and found 114 results.

Page 8 of 12 pages

Small PDF icon 33 Scotland River Basin District Appropriate Assessment

The river basin management plan for the Scotland river basin district 2009–2015 Appropriate Assessment Contents 1. Introduction 2 2. Scotland river basin district and European sites 4 3. Method 4 4.

Small PDF icon Dalgety Bay risk assessment group meeting - 16 March 2009

DB RAG FINAL 16 March 2009 Note of Meeting Dalgety Bay Risk Assessment Group DATE: 16 March 2009 TIME: 11.00 LOCATION: Surgeons Hall, Edinburgh SEPA HPA FSA MoD/Contractors George Hunter Joanne x Will

Small PDF icon Prospective Dose Assessment - Faslane and Coulport

Prospective Dose Assessment – Faslane and Coulport Model Used – PC Cream 2008 v1.2.0.44 Habit Survey(s) used – 2011 and 2006 Discharge data: 3 Coulport Gaseous: tritium ( H) 20 GBq from a stack height

Small PDF icon Appendix F: NFM assessment calculations

River Dee restoration, cbec UK Ltd, October 2013 APPENDIX F NFM ASSESSMENT CALCULATIONS River Dee restoration, cbec UK Ltd, October 2013 OVERVIEW This appendix contains additional detail to explain h

Small PDF icon Appendix L: Final options assessment

River Nith restoration, cbec UK Ltd, October 2013 APPENDIX L FINAL ASSESSMENT OF OPTIONS River Nith restoration, cbec UK Ltd, October 2013 Table L1 Ranking of options following final assessment and s

Small PDF icon Appendix H: Photos NFM assessment

River Nith restoration, cbec UK Ltd, October 2013 APPENDIX H Catchment photographs relating to NFM assessment River Nith restoration, cbec UK Ltd, October 2013 Figure H.1: Section of embankment locat

Small PDF icon Appendix H: Final assessment of options

River Dee restoration, cbec UK Ltd, October 2013 APPENDIX H FINAL ASSESSMENT OF OPTIONS River Dee restoration, cbec UK Ltd, October 2013 Table H1 Ranking of options following final assessment and sum

Small PDF icon IPPC H4 (part 2): Horizontal guidance for odour Part 2 - Assessment and control

Technical Guidance Note IPPC H4 Integrated Pollution Prevention and Control (IPPC) DRAFT Horizontal Guidance for Odour Part 2 – Assessment and Control i IPPC Preliminary Pages Commissioning Organisat

Small PDF icon Appendix E: NFM assessment results

River Dee restoration, cbec UK Ltd, October 2013 APPENDIX E NFM ASSESSMENT RESULTS River Dee restoration, cbec UK Ltd, October 2013 Table E1 Predicted changes in flood peak magnitude resulting from e

Small PDF icon Partial Business and Regulatory Impact Assessment (BRIA)

Partial Business and Regulatory Impact Assessment (BRIA) TITLE OF PROPOSAL Better Environmental Regulation: Proposals for a new Integrated Framework of Environmental Regulation and Future Funding Arra